Print

 

News from CTS 2015

 

Half term PAT testing

The October half term will again see CTS engaged in PAT testing. Two contracts using three teams will be testing domestic and specialist PAT in West Midlands schools so to continue their conformity to best practice for PAT.

CTS office upgrade

Due in no part to the hectic year, the whole of the CTS back office infrastructure has been updated. This incudes a major redesign of the CTS IT structures, data processing, ethernet networks and inventory systems.

Add to this the continued rollout of new technology, knowledge and systems within CTS for which customers are reaping rewards.

CTS equipment upgrade

CTS continue to upgrade and update its equipment base and 2015 has been no different. CTS has seen a significant upgrade to instrumentation, specialist test cables and leads, thermo graphic hardware and ancillary items for calibration, installation and testing equipment, too keep up with the ever evolving needs of our clients.

This ongoing process will allow CTS to be at the leading edge of industry hardware and best practice and will place CTS at the forefront of its field.

More weekend testing

Again the various CTS teams found themselves at various places for weekend testing. As is the case with many industrial applications, the most sensible and pragmatic time for testing is the weekend.

Recent contracts have seen the CTS teams in a chemical plating mill, steel pressing process operation, more commercial rail freight handing compounds and a wood process and storage yard.

As ever the testing has come in on time thanks in no part to the dedicated, knowledgeable and flexible workforce behind CTS.

Industrial and commercial building periodic testing

CTS continue to enjoy success in the field of testing industrial and commercial buildings and structures. Of late CTS has been involved in several periodic testing contracts in very different premises from high end commercial premises to industrial heavy engineering.

Both kinds of premises present their own challenges and the ever expanding CTS team have risen to complete the periodic testing not only on time but within the strict time frames where the buildings and systems can be made available.

F1 Silverstone 2015

Like in previous years 2015 has been another very successful year for the CTS team testing and certifying the temporary and permanent power installations at Silverstone for the British Grand Prix.

The team has continued its great working relationship with the Aggreko team to ensure that this event was a success, overcoming the occasional problem helping to deliver a complicated testing solution for the clients at Silverstone on a very tight timescale.

As an event it continues to grow and become ever more complicated it is good to see a successful test and a happy client.

More Silverstone Action Moto GP 2015

Yet more time for CTS site testing at Silverstone, this time for the annual Moto GP event. Similar team as per the F1 earlier in the year to bring together once again the knowledge and tools required to test such a complex and demanding event and venue.

Good results helped by good weather and the team knowing the venue and an ever improving methodology behind the buildup to the testing, the testing itself and the overall contract management.

Set against a tight schedule the event has gone well with the team finishing in pole position to ensure once again that we have a very happy client!

School Testing

Once again the 2015 summer break has been and gone and there has been more testing in the diary for several schools. This summer has seen the CTS team involved in PAT testing, periodic testing and some ad hoc testing for one long standing client.

As always the summer brings its own difficulties and the summer team continues to grow and encompass the needs of our clients and deliver the services to our clients.

Bolesworth Classic Show 2015

CTS since 2013 has continued its healthy relationship with the event organisers at the prestigious Bolesworth Classic show. The CTS team where once again on site to test and commission the temporary power installation and have done so over the years under some very difficult conditions under foot and tyre.

As always a good result for the team with some interesting mental problems to overcome including getting generators to behave after extensive modifications and rewiring to make sure that the event was a success as always.

A Hole In 1 the Ryder cup 2014

In September the CTS team were invited to test and certify the prestigious Ryder Cup held at Glen Eagles Scotland. Continuing our relationship with Aggreko our team was able to work flexibly with all parties to drive home a successful event.   

Open Golf 2015

Following on from our success at various other golfing events CTS have been busy around the greens once again continuing our relationship with the R&A Open at St. Andrews.

Other amongst the bunker contracts have seen CTS at The Johnnie Walker cup and the Boys championship Golf in 2015 as well as St Lytham, Royal St George's, Celtic Manor and various golf clubs around the UK.

 

 

 

 

 

Commercial Testing Services Limited
546 Wolverhampton Road East. Wolverhampton. WV4 6AA

2011. 2014, Copyright © Commercial Testing Services Ltd, 04732726 All rights reserved. All trademarks recognised.
By: Joomla Free Templates